Performance Validation
"An MHD unit was installed about 13 years ago... the tubes are perfectly clean down to the metal. One of the best investments I have ever made for this hospital."
Mr. L. J. Cucullu
Building Services, East Jefferson General Hospital

Technical Takeaway: 13-year validation proves that MHD technology maintains 100% heat transfer efficiency without chemical intervention.

Sugar Mill Case Studies

Meckling’s MHD technology drastically extends cleaning intervals for global milling operations.

Metric Before MHD With Meckling MHD
Cleaning Interval 3-7 Days 13-28 Days
90-Day Production 315,000 Tonnes 911,000 Tonnes
Operational Uptime Standard +289% Increase
U.S. Coast Guard Engineering Study
Restoration of Potable Water & Boiler Systems
Authored by L.G. Simpson, Civil Engineering Branch, 8th District

The Result (90-Day Operational Log):

  • Scale Removal: 120 Gallons of loose calcium carbonate removed from system.
  • Flow Restoration: 100% normal water flow completely restored.
  • Metal Protection: Inspection revealed Magnetite coating (zero metal loss).
  • Energy Recovery: Oil consumption dropped from ~85 to ~50 gallons per period.
VERIFIED SAVINGS: ~30% REDUCTION IN FUEL CONSUMPTION

Home | Company | Products | Contact